About Us

Singapore

Singapore Changi Airport

Changi airport group

Engineering and Master Planning

Client
Changi Airport Group

Period of Service
2011 – 2014

Project Description

CAI provides key expertise to Changi Airport Group in master planning and airfield engineering designs for projects such as the ongoing expansion of aircraft parking stands, the development of Terminal 4 at Changi Airport, and the airfield and master planning of the Changi East development, which is expected to be operational in the next decade.

From broad layout planning to design detailing, CAI consultants oversaw the development of airport related infrastructure, including runways, taxiways and aircraft parking apron pavements, airfield drainage system, ground access systems and roadways, car parks and taxi queues.

 

Location

Singapore

CAI services
  • Airport master planning
  • Service level analysis
  • Terminal capacity optimisation and facility sizing
  • Preliminary planning and functional designs
  • Airside and landside infrastructure detailed engineering design
  • Project construction management including supervision
MAIN MENU